|
|
|
|
Shenhua Group:Yongzhou Power Plant 2*1050 MW Project
|
|
China Resources Power: Caofeidian plant 2*1000MW coal-firedgenerating units projects
|
|
Power stations of East Hope Aluminum company in Xinjiang
|
|
Jinneng Group: Baode 2*660MW Low Calorific Value Coal Power Project
|
|
Shenhua Group:Jiujiang Power Plant 2*1052 MW Project
|
|
Sureland was the total solution provider for the automatic fire extinguishing system for “Three Gorges” Project
|
|
SURELAND has provided the Automatic Fire Detection and Extinguishing Systems for many large Power Generation Groups including Datang, Huaneng,Huadian and Guodian
|
|
Provided fire detection and protection systems for many hydropower stations, power plants, and substations of State Grid, China Southern Power Grid, China Resources Power and Erdos Group etc.
|
|
Laizhou Power Plant 2*1000 MW
|
|
Shenergy Group: Pingshan 2*660MW supercritical coal fired generating unit project
|
|
Inner Mongolia Togtoh power plant
|
|
Shandong Zouping Weiqiao power plant 6*660MW
|
|
Datong Coal Mine Group:Yanggao power plant
|
|
|
|
|
|
|
|